“Kinerja Sistem Array 13 PLTS Terapung 145 MW AC Cirata Dengan Simulasi PVSyst 7.4”. 2024. Indonesian Journal of Energy & Mineral 4 (2): 57-66. https://doi.org/10.53026/ijoem.v4i2.2.