“Kinerja Sistem Array 13 PLTS Terapung 145 MW AC Cirata Dengan Simulasi PVSyst 7.4” (2024) Indonesian Journal of Energy & Mineral, 4(2), pp. 57–66. doi:10.53026/ijoem.v4i2.2.